  1. Phase 1: Exterior / August 2022
  2. Phase 2: Interior / Common Areas / August 2024
  3. Phase 3: Interior / Bedrooms, Bathrooms, and Windows / August 2024

  • David “Phil” Albitz
  • Jim Durda
  • Peter Kenefick
  • Doug O’Leary
  • “Duce” Tsegaye

  • Exterior Wall Restoration
  • Exterior Painting
  • Street Façade Tuckpointing
  • Refurbished Flags
  • Exterior Security Lighting
  • Door Locking System
  • Upgraded Fire Alarm System
  • New Artificial Turf
  • New Landscaping
  • New Fencing

  • Best in class
  • Do it right
  • Do it once
  • Make the house “knucklehead-proof”
  • Leave a legacy

  1. Infrastructure
  2. Common Areas
  3. Bedrooms
  4. Bathrooms

  • LSE / Architects and Interior Design
  • MP Construction / General Contractor
  • Mavo Systems / Demolition
  • Modern HVAC / Heating and Plumbing
  • Fraser Morris / Electrical and Safety
  • Stoneworks Intl. / Flooring
  • CD Tile and Stone
  • MP Johnson / Fireplaces
  • Bruce Stromberg / Woodwork Restoration
  • Decortec / Paints & Coatings
  • Pulse Lighting
  • Shaw Stewart Lumber
  • Trovehl / Toilet Compartments
  • Commercial Door Systems
  • Stern Drywall
  • Blueprint Blinds / Window Treatments
  • Sonus Interiors / Furniture
  • Image Works / Nash Frame

Primary Features

  • New Windows
  • New ERV (Energy Recovery Ventilator) System
  • 98% Efficiency Boiler
  • New/Safe AC Outlets
  • LED Lighting
  • Restore Back Stairway

  • Back Office Rooms
  • Card Room
  • New Men’s Bathroom
  • Restored tile in TV Room
  • Resilient Flooring
  • Working Gas Fireplace
  • Hearty Area Rugs
  • Carpeted Stairway
  • Improved Lighting
  • New Furniture

Primary Features

  • 3 Room Configurations
  • New Doors
  • New Lighting
  • Multiple AC Outlets
  • Resilient Flooring
  • Permanent Furniture
  • Steel Bedframes
  • Steel and Wood Wardrobes
  • Quality Desks
  • Quality Desk Chairs

  • New Doors
  • SAE Branding
  • Dry Erase Board
  • Modern Locks

  • LSE / Planning & Design: $ 115,000
  • MP Johnson Construction: $1,312,840
  • Furniture + Art: $ 255,500

Total Estimated Costs: $1,683,340


RESTORE THE ROAR! PHASE 2 PROGRESS REPORT

July 31, 2023

  • Interior Design Plan
  • Interior Construction Costs
  • Production Schedule
  • Phase 2 Fundraising: $428K+
  • Common Areas Demolition
  • TV Room/Tile Restoration
  • New Framing and Drywall
  • Back Stairway Stripping
  • Furniture Selected/Ordered
  • Flooring and Carpeting Arrived

  • The ugly stuff has occurred
  • Carpeting, flooring, wallpaper, and old draperies have been cleared out
  • Electrical connections repaired, upgraded, and code

  • Prized historical photos and framed artifacts are tattered and torn. We are repairing and sometimes reframing the most valuable pieces.
  • Faux-wood wainscoting removed. A fresh coat of paint is on the way.
  • Thanks to Jim “Go Top Drawer” Durda for donating a beautiful round game table and matching chairs for the Card Room.

We are expanding the 2nd-floor library and converting it into a modern Study Room.
Room for up to 10-12 gents, in their own study carols, w/ ample lighting & power.
Large whiteboard for collaborative projects.

Minnesota Alpha Finance Committee

  • Nick Lindahl ‘69
    President / House Corp.
    Tax Attorney
  • Kerry Vermeer ‘80
    CFO / MBA / CFA
  • Peter Kenefick ‘78
    Treasurer

  • To date, $428K has been generously donated
  • To fully fund Phases 2 and 3, we need to raise a total of $1.6M to complete this legacy project
  • Payments/pledges can be made over five years
  • Any and all amounts are significant and appreciated!

  • 100% Tax Deductible
  • Our 501 (c)(3)
  • SAE Minnesota Alpha Education & Scholarship Fund c/o Accredited Investors
  • 5200 West 73rd Street Edina, MN 55439
  • TAX ID: 93-148396
  • Attn: Kathleen Broich

  1. An amount of money or property left to someone or something in a will.
  2. The long-lasting impact of particular events or actions that took place in the past or of a person’s life.

  • Drove the design and construction of the Chapter House
  • Purchased the land for the Chapter House
  • Guaranteed the financing for the Chapter House

  • 1949 Mural / Painting
  • 1950 U of MN / 3 Degrees